Build progress · live

Every marina build, the stage it is on and what it has cost.

This page reads straight from our own records. Where a figure is zero, nothing has been recorded against it yet — we would rather show you an empty column than a forecast dressed up as a fact.

Builds on the books

1

Entities formed or forming

Operating

0

Energized and earning

Capital recorded

$7,500

$0 already spent

Formation ladder

8%

1 of 13 sign-offs cleared

The builds

Each build runs the same six stages: planned, with counsel, filed, formed, funded, then operating.

GridLynQ Aggregator SPV I LLC

Master aggregator SPV · Delaware

Planned
  1. Planned
  2. With counsel
  3. Filed
  4. Formed
  5. Funded
  6. Operating

0% of the way through formation. Formation documents go to counsel.

Spent
$0
Committed
$0
Planned
$7,500
On the books
$7,500

Where the builds sit

  • 1

    Planned

  • 0

    With counsel

  • 0

    Filed

  • 0

    Formed

  • 0

    Funded

  • 0

    Operating

See the capital structure

No GridLynQ block is energized yet. Every figure shown is a modelled profile of a candidate site's conditions — speculative, not measured, and not a quote or a guarantee of results.