Power worth working with
An existing service we can build from, a utility willing to talk, and a plausible path to a bidirectional upgrade.
Pilot programme
We are selecting the first five pilot environments — a private marina, a municipal harbour, a boatyard, a federal waterfront and an RV estate. The host puts in no capital. GridLynQ funds, builds, owns and guarantees the battery plant on a long-term lease of the ground it stands on.
Nothing on this page is an offer. No block is energised yet, and applying commits neither side to anything.
Power worth working with
An existing service we can build from, a utility willing to talk, and a plausible path to a bidirectional upgrade.
Room for the plant
Space near the dock for container-sized battery blocks, and a route for cable between the blocks and the slips.
Site control
An owner, operator or public body who can sign a long-term lease for the ground the plant sits on.
A real timeline
You do not need to be ready today. You do need a view of when a decision could be made.
You apply
The form below. Fifteen minutes, no documents required, nothing committed on either side.
We screen it
Utility capacity, size and condition, ownership and a clean interconnection path. Every application is read.
We write back
Either a call to walk the numbers for your site, or a straight answer on why it is not a fit yet.
Site walk and terms
For sites that qualify: a walk of the docks and switchgear, then a draft lease and the exit terms in writing.
Tell us what you know. Anything you are unsure of can be left blank — we will ask when we reply.