Tranche 1
$2M · 10%
Tranche 1 — at signing
Technology, team employment build and legal work
Released when: Released on signing. No site conditions.
Seed round
We are raising $8.5M for 30%, released in two tranches. If you want in — or want in on different terms — tell us what you propose rather than waiting for a pitch. Every application is read and answered.
Nothing on this page is an offer of securities. No block is energised yet and no pilot site is named. Applying commits neither side to anything.
Tranche 1
$2M · 10%
Tranche 1 — at signing
Technology, team employment build and legal work
Released when: Released on signing. No site conditions.
Tranche 2
$6.5M · 20%
Tranche 2 — at the pilot gate
First pilot build
Released when: Conditional. If the gate is not met, tranche 2 is not drawn.
Gates, not promises
The second payment only moves once the lease is recorded, the interconnection position is accepted and the lien on plant and batteries is in place.
Your terms are welcome
If the structure we have published is not the one you want, say so on the form. It is a starting point, not a condition of applying.
Diligence behind an NDA
The deck, the terms document and the programme timeline open in the private investor room once the mutual NDA is signed and cleared.
You apply
The form below. Amount, tranche, structure and timeline — an estimate is fine on any of it.
We read it
Every application is read by the CEO. Nothing is screened out by a form.
We write back
Either a time to talk through the model and the gates, or a straight answer on fit.
NDA and the room
If it goes further: the mutual NDA, then the private investor room with the deck and terms.
Anything you are unsure of can be left blank — we will ask when we reply.
No GridLynQ block is energized yet. Every figure shown is a modelled profile of a candidate site's conditions — speculative, not measured, and not a quote or a guarantee of results.